Pre- Engineered Buildings (PEB)

SQUARE Contracting delivers complete Pre-Engineered Building (PEB) Steel solutions across Egypt, KSA, and the MEA region. Our services cover engineering design, supply, fabrication, and installation, ensuring fast, efficient, and high-quality project delivery. We are committed to advanced engineering tools, competitive pricing, and operating with honesty, transparency, and integrity.

Our Approach

 PROJECT STUDY

We analyze every detail of the client’s requirements to provide the most efficient and economical solution, supporting the project’s feasibility and overall vision.

 ENGINEERING

We design the project to align with architectural needs and technical usage, applying the appropriate engineering codes. This results in precise shop drawings for the fabrication stage.

FABRICATION

Raw materials are inspected upon arrival, and fabrication begins based on the approved shop drawings. Each component is produced under strict quality supervision until the final product is ready for the next phase.

QUALITY CONTROL

All fabricated components undergo thorough inspection before shipping to ensure full compliance with project specifications.

 INSTALLATION

Delivered components are organized and assembled to form the steel structure, followed by cladding installation and all related works.

HANDING OVER

The project is completed with all required elements and prepared for formal handover.

PROJECT STUDY

We analyze every detail of the client’s requirements to provide the most efficient and economical solution, supporting the project’s feasibility and overall vision.

ENGINEERING

We design the project to align with architectural needs and technical usage, applying the appropriate engineering codes. This results in precise shop drawings for the fabrication stage.

FABRICATION

Raw materials are inspected upon arrival, and fabrication begins based on the approved shop drawings. Each component is produced under strict quality supervision until the final product is ready for the next phase.

QUALITY CONTROL

All fabricated components undergo thorough inspection before shipping to ensure full compliance with project specifications.

INSTALLATION

Delivered components are organized and assembled to form the steel structure, followed by cladding installation and all related works.

HANDING OVER

The project is completed with all required elements and prepared for formal handover.